LinkedTIERRA Thermal·Production·12 ZN Live · HOU-01

Heat is costing your facility 2.6% productivity per degree.
We find it. We fix it.

Drone thermal imaging, calibrated ground sensors, and 5-year satellite analysis — combined into one engineering model that tells you exactly where to spend.

<30s

Data latency

R² 0.95+

Model accuracy

6

Instrument types

Field Operations · HOU-01Warehouse A · 85,000 sqft
Live
Cool
22°C58°C

Peak surface

58°C

↑ Zone A

WBGT avg

31.2°C

↑ +3.2 over ACGIH

Model R²

0.98

Validated

Zones

12/12

All reporting

Anomaly log3 active

Zone A exceeded threshold — 58°C peak

14:32 · 2 min ago

Zone C trending warm — predicted 49°C

14:28 · 6 min ago

Cooling intervention Zone B — effective

13:55 · 39 min ago

§ 01Methodology · Four data sources, one engineering modelIn Practice Since 201704 INPUTS

Every facility is a system.
We make it intelligible.

Survey from the air. Ground-truth with calibrated instruments. Cross-check against five years of satellite data. Model the combined signal until we can predict it. The model is the deliverable — not the survey.

45min/85K sqft

Drone coverage

60scontinuous

Sensor refresh

5yrLandsat 8/9

Satellite history

R² 0.95+

Validation

SENSORSWBGTDRONESATELLITETIERRASYS-01 · THERMAL OSv2.6 · LIVE4 INPUTS · 12 NODESINGEST 100%
§ 02Standard engagement · 4-week thermal diagnosticRepeatable04 WEEKS

From systems assessment to ranked mitigation — in three to four weeks.

The standard engagement is fixed scope, fixed timeline, fixed deliverables. You know exactly what you receive and when. Tier pricing starts at $450 for a small-facility scan.

DJI Mavic 2 Enterprise thermal drone
Week 0EQP-DRN-02

Survey

DJI Mavic 2 thermal mission. Grid pattern, 30m AGL. Full-facility heat anomaly map. Sub-meter resolution.

ON-SITE
Handheld WBGT meter for field measurement
Week 1EQP-GND-03

Ground truth

Handheld WBGT at every zone. BlueMaestro continuous sensors. ACGIH 2023 compliant. Verified against drone data.

ON-SITE
Landsat 8/9 satellite thermal imagery
Week 2EQP-SAT-04

Satellite drift

Landsat 8/9 thermal Band 10 time-series. 5-year drift baseline. Macro context for current readings.

REMOTE
Metashape thermal orthomosaic engineering output
Week 3REP-01

Model + Report

Regression model trained against ground truth. R² > 0.95 validated. Mitigation pathways ranked by ROI. Branded engineering report.

REMOTE

Duration

3-4 weeks

On-site days

4-6

From

$450

Typical ROI

3-6 mo

STANDARD ENGAGEMENT
§ 03Proof · Houston Warehouse A · 85,000 sqftValidated OutputJUL 2025

85,000 sqft warehouse — avoided a $300K HVAC quote.

Summer interior 38–42°C, WBGT 30–32°C. Operations manager was about to sign a brute-force HVAC retrofit. We showed there was a better answer — and saved them ten times the project cost.

Houston warehouse Zone A thermal anomaly — peak 58°C
Zone A · Thermal anomaly
58°C peak
Metashape 3D thermal orthomosaic of Houston warehouse
Metashape · 3D thermal mesh
0.98 R²

CAS-01 · Case analysis · Houston warehouse · July 2025

Validated output

The story, in three steps.

The story, in three steps.

01
Before. Heat complaints from line workers. Two reported heat exhaustion incidents in July. Insurance carrier asking about WBGT compliance. Operations manager assumed the only fix was HVAC.
02
What we did. 4-week engagement. Drone thermal mapped the building. Ground sensors across 12 zones. 5-year Landsat analysis showed warming trend. Regression model identified Zone A (peak 58°C) drove 76% of productivity loss.
03
After. Targeted intervention in Zone A — radiant barrier + spot cooling — solved it for under $30K. Heat risk down 40%, productivity up 18%. No HVAC retrofit needed.

Productivity

+18%

Heat risk

−40%

vs HVAC quote

<10%

Payback

5 mo

§ 04Instruments · Six categories · NIST-traceableCalibrated06 EQP

Calibrated, certified, field-proven.

Every measurement traces back to certified instruments. Standards are ACGIH 2023, ASHRAE, OSHA, and NIST traceable. Four of the six shown here, plus environmental and integration connectors.

ACGIH 2023OSHA 1910.132NIOSH RELFAA Part 107ISO 7243
◉ Initiate engagement

Let's diagnose your facility.

20-minute call. No commitment. We'll tell you exactly which instruments fit your situation and what a deployment would look like — before we send a single proposal.

Response SLA < 24hHouston-basedSun Belt deployment